Angela's Tools · Chapter 25 · Volcanic Eruptions and Earthquakes Lab 2 of 3 · Recording sheet

Shake Table Bridge Challenge: Define, Build, Shake, Improve

Investigation question: How can a craft-stick bridge be designed to carry its load through three measured levels of shaking, meeting the performance targets its importance demands, within a materials budget?

Engineering design challengeGroups of 42 sessions Setup 10 · Activity 90 · Cleanup 10 min MS-ETS1-1 · practiceMS-ETS1-2 · practiceMS-ESS3-2 · practice
NameGroupDate

Your role today

Safety

Procedure

  1. Session 1. Draw an importance card. Read the performance targets for your bridge type and the design rules. Complete the design brief: write each criterion as a precise, measurable statement and say how you will check it, then list the constraints. Answer q1 and q2.
  2. Calibrate the shaker: with an empty platform, the shaker practices each level with the metronome while the recorder counts strokes for 10 seconds. Repeat until the count is within 2 of the target (20, 27, 33). Record both counts.
  3. Sketch version 1 and label the materials, joints and how the load's weight is carried to the banks. Estimate the cost; it must not exceed your budget.
  4. Build version 1 (25 minutes). The bridge must span the 25 cm gap, have a deck at least 6 cm wide, rest on the banks with nothing touching the platform between them, and be attached only with budgeted tape, clips, string or bands. Record the actual materials and cost.
  5. Session 2. Test version 1. Measure the deck height at mid-span with no load, then place the penny bag at mid-span and measure again (sag = unloaded height minus loaded height). Shake at Level 1, inspect, measure and rate; then Level 2; then Level 3. Do not repair between levels. Use the rating scale exactly as written.
  6. Report your bridge type, cost, main design features and three ratings to the class table. Study the table and answer q3: which features do the best-performing bridges share?
  7. Redesign: change one main feature (answer q4 first, including your prediction), staying within budget. Build version 2 and test it with the same shaker, the same load position and the same levels.
  8. Answer the analysis questions individually. Return pennies, rollers and boxes; recycle unbroken sticks.

Record your observations

Lab 2 recording sheet: Shake Table Bridge Challenge

Your county needs a new bridge in earthquake country. How well the bridge must survive shaking depends on how important it is. Your group has drawn one bridge type. Your job is to write precise criteria, build a bridge that meets them within your budget, test it with measured shaking, and improve it using the class's evidence.

Measured shaking levels — A stroke is one move of the platform from one side mark to the other. Level 1 (frequent, moderate): marks 1 cm each side of center, one stroke per beat at 120 beats per minute, for 10 seconds (20 strokes). Level 2 (rare, strong): marks 2 cm each side, 160 beats per minute, 15 seconds (40 strokes). Level 3 (very rare, strongest): marks 3 cm each side, 200 beats per minute, 15 seconds (50 strokes). Before testing, count strokes for 10 seconds; you must be within 2 of 20, 27 or 33.
Rating scale (decide after each level) — No damage: load on the deck, no joint loosened, sag increased by 2 mm or less. Minor damage, stays open: load on the deck, at most 2 joints loosened and none broken, sag increased by 5 mm or less. Damaged, emergency use only: load on the deck and the deck still spans the gap, but more damage than that. Closed, still standing: the load fell off or the deck tilted badly, but the bridge still spans the gap without touching the platform. Collapsed: any part of the deck touches the platform between the banks, or the bridge falls off a bank.
Performance targets by bridge type (meet the target or do better)
Bridge type and budgetAfter Level 1After Level 2After Level 3
Ordinary (farm road), 40 unitsMinor damage, stays openClosed, still standingClosed, still standing
Important (main road), 55 unitsNo damageDamaged, emergency use onlyClosed, still standing
Lifeline (only hospital route), 70 unitsNo damageMinor damage, stays openDamaged, emergency use only
Material prices
MaterialCost in units
1 craft stick1
10 cm of masking tape1
1 paper clip1
1 rubber band2
10 cm of string1
1 index card2

Design rules: span the 25 cm gap and rest on top of both banks; deck at least 6 cm wide; nothing may touch the platform between the banks (it is the river); only the listed materials, no glue; 25 minutes to build each version; every piece of material counts toward the budget, including tape used to attach the bridge to the banks.

Our design brief (write precise, measurable statements)
ItemOur precise statementHow we will measure or check it
Bridge type and budget
Criterion after Level 1
Criterion after Level 2
Criterion after Level 3
Load and span criteria
Constraint: budget
Constraint: materials and rules
Constraint: time
1.A classmate's brief says, 'Our bridge should be strong and not break.' Rewrite this as two precise criteria for your bridge type that someone else could check with a ruler and the rating scale.
2.Which of your criteria or constraints comes from the science of earthquakes (how strong or how frequent shaking is), and which comes from people's needs or limits? Give one of each.
✎Sketch version 1 from the side and from above. Label the materials, every joint, the banks, and arrows showing how the weight of the load travels to the banks.
Version 1 materials and cost
MaterialQuantity usedUnit costCost
Craft sticks1
Tape (10 cm pieces)1
Paper clips1
Rubber bands2
String (10 cm pieces)1
Index cards2
Total
Shaker calibration (strokes counted in 10 seconds)
LevelTarget strokes in 10 sPractice count 1Practice count 2
120
227
333
Version 1 test results
StageLoad on deck? (Y/N)Deck height at mid-span (mm)Sag change since loaded (mm)Joints loosened / brokenRatingTarget met? (Y/N)
No load
Loaded, before shaking0
After Level 1
After Level 2
After Level 3
Class comparison table
GroupBridge typeMain design featuresCost (units)Level 1 ratingLevel 2 ratingLevel 3 rating
1
2
3
4
5
6
7
8
3.Look across the class table. Which design features do the best-performing bridges share, and which features show up in bridges that failed early? Name at least two features and the groups that show them.
4.Redesign plan: which one main feature will you change for version 2, which test result is it meant to fix, and what do you predict will happen at each level?
Version 2 test results
StageLoad on deck? (Y/N)Deck height at mid-span (mm)Sag change since loaded (mm)Joints loosened / brokenRatingTarget met? (Y/N)
No load
Loaded, before shaking0
After Level 1
After Level 2
After Level 3

Analysis questions

5.Did version 1 and version 2 meet each of your criteria and stay within every constraint? Use the ratings, sag changes and costs from your tables.
6.Pick the feature that made the biggest difference across the class (for example triangles, cross-bracing, a wide or low structure, a curb on the deck, or flexible connections). Explain, in terms of forces and motion, why it helped the bridge survive shaking.
7.Level 3 moves the platform 3 times as far as Level 1 and about 1.7 times as often. Describe one way the shake table is a good model of earthquake shaking and two ways it is not like a real earthquake hitting a real bridge.
8.The three bridge types had different targets and budgets. Explain why a county would set a higher target and spend more on a lifeline bridge than on a farm-road bridge, using the idea that stronger shaking is rarer.
9.List three things the class kept the same so that the designs could be compared fairly. Then name one thing that may still have made the comparison unfair and how you would fix it.
10.After the 1995 Kobe earthquake, Japan placed many new buildings on rubber-and-steel bearings, and parts of the new Bay Bridge span are designed to bend and absorb energy so the main structure is protected. Did any bridge in your class use a similar idea? Explain how letting part of a structure move or bend can reduce damage.
Angela's Tools · Chapter 25 · Volcanic Eruptions and EarthquakesLab 2 of 3 · Student recording sheet