Learning target: I can evaluate competing designs for restoring a bay shoreline against criteria and scientific, economic and social constraints, design an improved plan with calculations, and justify how it maintains biodiversity and ecosystem services.
You and a partner are advisers to a team restoring former salt ponds on the shore of San Francisco Bay. Read the background, which is real, and the problem, which is a simplified version invented for this worksheet. The numbers in both datasets are teaching estimates. Work through Parts A to D in order: understand the problem, evaluate three competing designs, build your own plan, then justify it. Plan together, but each of you writes your own answers to Part D.
You will need: This worksheet, Pencil, Calculator
For more than a century, companies built shallow ponds along the edge of San Francisco Bay to make salt by letting seawater evaporate. Levees (walls of earth) around the ponds kept the tides out, and the tidal marshes that once grew there disappeared. In 2003, state and federal agencies bought 15,100 acres of these ponds in the South Bay to restore them. The project's goal is to turn at least half of that land back into tidal marsh, which is home to endangered animals such as the California Ridgway's rail and the salt marsh harvest mouse. But the ponds have become important too: tens of thousands of migrating shorebirds and ducks rest and feed in them. So the project opens some ponds to the tides, keeps others as managed ponds, measures what happens, and decides step by step whether to open more.
| Measure | A: Open all 8 ponds to the tides | B: Keep all 8 as managed ponds | C: Open about half, keep about half |
|---|---|---|---|
| Tidal marsh (acres) | 2,000 | 0 | about 1,000 |
| Ridgway's rail pairs expected | 60 | 0 | about 30 |
| Waterbirds at the busiest time (30,000 today) | under 3,000 | 30,000 | about 15,000 to 20,000 |
| Young fish raised in marsh channels | many | none | some |
| Storm waves calmed before reaching levees | most | little | some |
| Cost to build ($ millions) | 46 | 4 | about 21 to 25 |
| Yearly upkeep ($ millions) | 0.2 | 1.6 | 1.0 |
| Biggest uncertainty | Will enough mud settle to build marsh before sea level rises? | Old pumps and levees wear out and cost more | Which ponds should be opened? |
| Pond | Area (acres) | Mud supply for building marsh | Waterbirds at busiest time | Next to homes? | Cost to open to tides ($ millions) |
|---|---|---|---|---|---|
| P1 | 300 | high | 2000 | no | 6 |
| P2 | 250 | high | 6000 | no | 5 |
| P3 | 200 | low | 1500 | yes | 7 |
| P4 | 250 | medium | 5000 | yes | 6 |
| P5 | 300 | low | 8000 | no | 6 |
| P6 | 200 | high | 1000 | yes | 5 |
| P7 | 250 | medium | 3500 | no | 5 |
| P8 | 250 | low | 3000 | yes | 6 |
| Criterion or constraint? | Scientific, economic or social? |
|---|---|
| 1. Building costs no more than $25 million. | |
| 2. At least 15,000 waterbirds can still use the complex. | |
| 3. More Ridgway's rail pairs is better. | |
| 4. Yearly upkeep is no more than $1.0 million. | |
| 5. At least 1,000 acres become tidal marsh. | |
| 6. Marsh should form before sea level rises much more. | |
| 7. Neighbors keep their trail on the outer levee. | |
| 8. More storm waves are calmed near homes. |
| A: Open all | B: Keep all | C: Open about half |
|---|---|---|
| Build cost no more than $25 million | ||
| Upkeep no more than $1.0 million a year | ||
| At least 15,000 waterbirds | ||
| At least 1,000 acres of tidal marsh | ||
| Still in the running? |
| Your plan |
|---|
| Ponds opened (list them) |
| Total acres opened |
| Total cost to build ($ millions) |
| Waterbirds kept (30,000 − birds in opened ponds) |
| Yearly upkeep ($ millions) |
| Opened ponds with high or medium mud supply |
| Opened ponds next to homes |
Step 1: Start with ponds that have a high mud supply, because marsh forms fastest there. Step 2: Add up acres as you go until you reach at least 1,000. Step 3: After each pond you add, subtract its birds from 30,000 and add its cost, and check that you still have at least 15,000 birds and no more than $25 million. If a limit fails, swap one pond for another with fewer birds or a lower cost. Upkeep: (8 − ponds opened) × 0.2 + 0.2 must be 1.0 or less.
Suppose new measurements show sea level is rising faster than expected, so in this model only marsh with a high mud supply forms in time; medium-mud marsh now takes 40 years. Redo your plan. Can you still meet every limit? If not, which limit would you ask the agencies to change, and why? Write a short paragraph arguing for your choice using numbers from the pond table.