Learning target: I can turn vague goals into precise criteria and constraints, evaluate competing plans for stopping an invasive species with a simple model, and design and justify a better plan within a budget.
You and a partner are consultants to a water district. Read the situation, then work in order. Part A: make the goals precise. Part B: run the two competing plans through the model and check them against the criteria. Part C: design your own plan and defend it. Part D: test your criteria and plan how to monitor. All costs and effects are teaching estimates for an invented reservoir. Each partner writes their own q6 and q7.
You will need: This worksheet, Pencil, Calculator
Quagga and zebra mussels are small freshwater mussels native to the region around the Black and Caspian Seas. They reached the Great Lakes in the late 1980s, probably in ships' ballast water, were found in Lake Mead, Nevada, in 2007, and have since spread to some California reservoirs, through aqueducts carrying Colorado River water and on trailered boats moved between lakes. Adults can live for days out of water in a damp corner of a boat, and their larvae are too small to see. Once they take hold, they filter huge amounts of plankton out of the water, leaving less food for the small animals and young fish at the base of the food web. They crust over rocks, docks and the shells of native mussels, and they clog the pipes that carry water to treatment plants and power stations. No one has yet found a way to remove them from a large lake.
Sierra Vista Reservoir (invented for this worksheet) stores drinking water for 200,000 people, feeds a small hydropower plant and supports a trout fishery and native fish. It has about 20,000 boat launches each summer and no mussels yet. The district estimates that, with no prevention, about 12 boats carrying live mussels would arrive each summer.
| Part | Cost per summer | Effect in the model | Effect on visitors |
|---|---|---|---|
| A. 'Clean, Drain, Dry' signs and campaign | $10,000 | 1 in 4 boats that would have arrived with mussels arrive clean instead | None |
| B. Inspection station on the entrance road, open 6 a.m. to 8 p.m. | $220,000 | Inspectors find 9 of every 10 boats with mussels that they check and miss 1 in 10 | Average weekend wait of 25 minutes |
| C. Gates that lock the ramps when the station is closed (needs B) | $40,000 | Without gates, 1 in 3 boats with mussels arrives after hours and launches uninspected; with gates, none do | Late arrivals wait until morning |
| D. Hot-water cleaning unit (needs B) | $90,000 | Boats found with mussels are cleaned and may launch; without D they are turned away | Boats that are cleaned wait about 40 minutes more |
| E. Monitoring: sampling plates and larva samples every two weeks | $30,000 | Stops no boats, but would find a new mussel population within a year instead of after about three years | None |
| F. Second inspection crew (needs B) | $80,000 | Same checking as B | Average weekend wait drops from 25 to 10 minutes |
| Plan | Proposed by | Parts |
|---|---|---|
| Plan 1 | The boaters' club | A + B + F |
| Plan 2 | The water district staff | A + B + C + D + E |
| Criterion or constraint? | Precise version |
|---|---|
| 'Keep the mussels out.' | |
| 'Don't ruin summer for visitors.' | |
| 'Know quickly if they get in anyway.' | |
| 'Don't make people who did nothing wrong lose their trip.' | |
| 'Stay within our money' and 'no chemicals in the lake' |
| Plan 1 (A + B + F) | Plan 2 (A + B + C + D + E) |
|---|---|
| Total cost per summer | |
| Boats with mussels arriving | |
| Boats that skip inspection | |
| Boats inspected | |
| Boats the inspectors miss | |
| Contaminated launches per summer | |
| Average weekend wait | |
| Found boats: cleaned or turned away? | |
| Monitoring in place? |
| C1 | C2 | C3 | C4 | Budget |
|---|---|---|---|---|
| Plan 1 | ||||
| Plan 2 |
| Plan 3 |
|---|
| Parts chosen (and any fee) |
| Total cost and money available |
| Contaminated launches per summer |
| Average weekend wait |
| Found boats: cleaned or turned away? |
| Monitoring in place? |
| Criteria passed (C1-C4) |
Write the five model steps down the side of your page and fill in a number after each one. Example for a plan with only B: start 12; no A, so 12 arrive; no C, so 12 ÷ 3 = 4 skip; 12 − 4 = 8 inspected; 8 × 0.1 = 0.8 missed; contaminated launches = 4 + 0.8 = 4.8. For q1, ask 'How would we know?' and put a number or a yes-or-no test in every answer.
The model treats every inspection as equally good and every summer as the same. List three things in the real world that could make the model wrong (for example, tired inspectors on busy weekends, boats arriving by an unguarded dirt road, or a rise in visitors from a lake that already has mussels). For one of them, change a number in the model, rerun your Plan 3, and explain whether your recommendation still holds.